Time-lapse video released of 6,000-ton railway bridge arch being floated into place

The constructors of the bridge connecting the Crimean peninsula with mainland Russia have released time lapse footage of a 227-meter-long railway arch weighing 6,000-ton being floated to its construction site, where it is to be installed on support columns.

Source

NO COMMENTS